Media kit

Logos, colours and boilerplate text

Everything you need to represent Ovoo and its projects accurately in your coverage. The files are free to use; please do not alter the logo's proportions or colours.

Logos

Ovoo logo: primary logo
Primary logo
For light backgrounds, SVG
Ovoo logo: primary logo
Primary logo
For light backgrounds, PNG 400×400
Ovoo logo: dark background
Dark background
For dark backgrounds, SVG
Ovoo logo: single colour
Single colour
For black-and-white print, SVG
  • Leave clear space of at least one ring's width around the logo.
  • Do not rotate, stretch or add shadows or effects to the logo.
  • Use the "Dark background" version on dark backgrounds.

Image library

Cinga architecture
Cinga architecture
Cinga · From field data to reports, institutional memory and emergency alerts; PNG 1137×782

Videos

Cinga product film
Cinga · MP4 1920×1080, 2 minutes, 45 MB
Cinga product film (vertical)
Cinga · 9:16 for social media; MP4 1080×1920, 2 minutes, 24 MB

Brand colours

Ovoo Orange
The triangle in the logo; accent colour
#F39229
Anthracite
The rings in the logo; body text
#3A3F40
White
Background
#FFFFFF

Boilerplate text

Short description

Ovoo Teknoloji A.Ş. is a technology company that builds monitoring, analytics and AI solutions for energy and field facilities.

About Ovoo Teknoloji

Ovoo Teknoloji A.Ş. is a technology company that develops hardware, software and AI solutions for energy and field facilities. Its projects include the Cinga platform, which monitors pumping and energy facilities in real time and analyses them with artificial intelligence.

About Cinga

Cinga is a monitoring and analytics platform that collects voltage, current, power and energy data from devices in the field. Using Cinga Score, the collected data is automatically rated for grid quality, motor condition and reactive power penalty risk. Facility owners and operators ask Cinga AI questions about their facilities in plain language and receive instant analysis and recommendations. Cinga serves water and pumping stations (Suv), solar power plants (Kün), industrial facilities (Temir) and agricultural irrigation (Tarıg). Cinga is developed by Ovoo Teknoloji A.Ş.